Authorization - constructions*
favorite_border
Add favorite
Procedure
Online
Companii
Cetateni
National
Issuance of authorization for placement of constructions, economic objectives, intersection arrangements in the road area and arrangement of access to the county road.
Observations:
- The placement distances for economic objectives that generate additional traffic, from the edge of the carriageway of the county road, outside localities, must be respected, minimum 30 m, in accordance with art. 47, paragraph 1 of G.O. 43/1997 with subsequent amendments and completions. Constructions that generate additional traffic are considered to be production units, commercial complexes, wholesale warehouses, show-room type units, tourist objectives, residential neighborhoods, industrial parks, as well as any other objectives and/or similar constructions where economic activities take place.
- When preparing the documentation, the provisions of G.O. 43/1997 regarding the legal regime of roads with subsequent amendments and completions, Order of the Ministry of Transport no. 1835/2017 for the approval of technical norms regarding the conditions for the design and placement of constructions, installations and advertising means in the road area, on bridges, passages, viaducts, in road tunnels, as well as the arrangement of access roads to public roads, GD 525/1996 for the approval of the General Urban Planning Regulation, the Normative for the arrangement of intersections, code AND 600/2010, standards SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82 regarding road signage, must be respected.
- The documentation must be correlated with the approved urban planning documents (PUG / PUZ) for the studied area and with the permits issued for the accesses to the county road.
- The documentation prepared by a road specialty designer will bear the original signature and stamp of the designer and of the certified project verifier.
- Each sheet will have in the lower right side a title block which will include: the name of the design company that prepared the project, registration or authorization number, as applicable, the title of the project and the sheet, project and sheet number, date of preparation, name, capacity and signature of the preparer, verifier and the project manager, in accordance with annex no. 3 to the Order of the Ministry of Regional Development and Housing no. 839 of October 12, 2009 for the approval of the Methodological Norms for the application of Law no. 50/1991 regarding the authorization of construction works, with subsequent amendments and completions.
Note: At the request of D.J.A.D.P. Iaşi, other documents/plans/details in addition to those specified in the "Required documents" section will be presented if the situation requires it.
*Entitled persons
Regulated professions
Required documents
Denumire
Descriere
Obligatoriu
Semnătură digitală
Tip document
Descarcă
-
Request*
Descarcă
Scanned document
Request signed and stamped by the beneficiary in which the following must be specified: company details – full address, phone/fax number, e-mail, account number, bank where the account is opened, names of the company’s legal representatives, their positions, name of the person designated (within the company) to be responsible for complying with the conditions in the authorization, legal status of the land.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Prior approval*
Descarcă
Scanned document
The prior agreement issued by D.J.A.D.P. Iaşi in case it was obtained.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Approval of the Road Service*
Descarcă
Scanned document
The approval of the Road Service within the Iaşi County Police Inspectorate.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
ID*
Descarcă
Scanned document
Copy of the identity document of the person responsible for complying with the conditions of the authorization.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Property documents*
Descarcă
Scanned document
Ownership / concession / land lease / loan agreements accompanied by cadastral plans endorsed by the County Office of Cadastre and Real Estate Publicity.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Urbanism certificate*
Descarcă
Scanned document
Urbanism certificate.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Photographs*
Descarcă
Scanned document
Relevant digital photographs from the area of the county road and the designed objective; the name of the photograph will be DJ and the km position and the direction of traffic on the DJ (county road).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Company documents*
Descarcă
Scanned document
Company documents: certificate of registration, fiscal registration certificate, articles of association, resolution.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Report of the project verifier*
Descarcă
Scanned document
The report of the certified project reviewer for requirements - A4, B2, D - according to Law 10/1995 and MLPTL Order no. 777/2003.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Technical memorandum*
Descarcă
Scanned document
Technical presentation memorandum of the proposed work which will include: the current situation; the classification of the land in the General Urban Plan approved by D.J.A.D.P. Iaşi; the designed solution, a description of the works subject to the project for approval with references to the location (including the road and km position), its topography; a description of the objective's activity; induced traffic (evaluation of the type of induced traffic and number of vehicles during peak hour); presentation of the access solution to the county road, the placement of the buildings in relation to the geometric elements of the county road; the adopted road structure for the arrangement of the access road / side road / collector road (as applicable); traffic study (circulation capacity, level of service) in the case of commercial complexes; the method of solving the continuity of rainwater drainage along the county road in the area of the objective and the intersection; the method of collecting and discharging rainwater and waste water from the premises; the type of existing cross-sectional profile; existing and proposed road signaling for traffic regulation under the new conditions, designed according to SR 1848/1/2/3 – 2011, SR 1848/7 – 2015, STAS 1848/5-82; the structure of the road system for the designed access; a road system equivalent to that of the county road will be adopted; the method of lighting the intersection, at night, if applicable; the situation of roadside vegetation; presentation of the geometric elements of the collector road or the service road, if applicable; the method of ensuring road traffic during the execution of works, the km position of the collector road (if applicable); visibility distances on the county road in the area of its intersection with the access road; calculation of the number of parking spaces, in accordance with HG 525/1996.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Site integration plan*
Descarcă
Scanned document
Zoning plan on which the location of the land will be marked.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Situation plan*
Descarcă
Scanned document
Site plan at a 1/500 scale which will be drawn on a topographic base highlighting the elevations, based on the plan approved and certified by the Office of Cadastre and Real Estate Publicity, regarding the neighboring properties and land boundaries. The site plan will include: the cadastral parcel for which the urbanism certificate was issued, the neighboring properties along the county road on both sides of the objective (along the county road on both its sides) over a length of 100 m, with depiction of all accesses/buildings/collector road (specifying dimensions and distances); intersections of the collector road with the county road (if applicable); the projected and existing buildings, the location of fuel pumps/canopy/tanks (in the case of fuel distribution stations), the dimensions, names and purposes of each building body, fencing, distances from the axis of the county road to constructions, fencing, fuel tanks, fuel delivery pumps; the distance from the property boundary to the axis of the county road and to the edge of the road pavement shall be specified; the solution for access to the county road via direct access / via a side road / via a service road / collector, etc.; pedestrian and vehicular accesses within the property, sidewalks, traffic flow diagram, the solution for arranging road access to the county road; kilometer and meter positions of the land and the access to the county road; vertical systematization of the land; existing and proposed road signage (vertical and horizontal) for regulating traffic under the new conditions; parking spaces in accordance with HG 525/1996; the system for collection and discharge of water within the premises, the septic tank, hydrocarbon separator, etc.; on the site plan, a simulation of the fuel tanker refueling route to the tank (in the case of fuel stations), as well as the route of long vehicles using the site’s services, shall be presented.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Situation plan*
Descarcă
Scanned document
Site plan with the vertical systematization of the enclosure, the sewer network, and the hydrocarbon separator.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Cross-sectional profiles*
Descarcă
Scanned document
Transversal profiles of the county road at a scale of 1/100 (1/50) at the intersection (in the axis and lanes corresponding to the access) and arrangements indicating the structure of the proposed road system for the new access/side road, the system for ensuring the continuity of stormwater along the county road, the geometric elements of the county road, ground elevations, project elevations, gradients, raised island, distances from the geometric elements of the county road to the projected buildings, etc.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Transversal profiles*
Descarcă
Scanned document
Transverse profiles through the collector road (if applicable).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Execution detail sheets*
Descarcă
Scanned document
Details for the systems for ensuring rainwater drainage along the road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Execution detail sheets*
Descarcă
Scanned document
Details for the road system related to the access with the connections to the county road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Local Council Decision*
Descarcă
Scanned document
Local Council Decision approving PUZ/PUG.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Point of view*
Descarcă
Scanned document
The point of view from the consultancy / design firm for modernization / rehabilitation works of the county road in case the site is located on a road segment undergoing rehabilitation / modernization or in the vicinity of the route of a future road.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notarial statements*
Descarcă
Scanned document
Notarial statements (as appropriate) regarding the agreement of neighboring landowners for the construction of access roads on the property land.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Notarial declaration*
Descarcă
Scanned document
The notarial declaration by which the applicant grants permission for the construction of the collector road and its use by the owners of the neighboring lands.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Agreement*
Descarcă
Scanned document
Consent of the owner/administrator of the secondary road (if applicable).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fees
Title
Payment method
Value
Currency
Taxă fixă
OP
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
30
Calendar days
Notification deadline:
5
Calendar days
Legislation
Appeal routes
In the case of a dispute between the beneficiary and the competent authority, the provisions of the common law are applicable.
*Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated:
02 August 2022
Publicat de către:
A paragraph is a self-contained unit of a discourse in writing dealing with
a particular point or idea. Paragraphs are usually an expected part of
formal writing, used to organize longer prose.
Institution responsible with document:
Publicat de către:
A paragraph is a self-contained unit of a discourse in writing dealing with
a particular point or idea. Paragraphs are usually an expected part of
formal writing, used to organize longer prose.
County Directorate for Road and Bridge Administration Iasi*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
County Directorate for Road and Bridge Administration Iasi*
B-dul Ştefan cel Mare şi Sfânt nr. 13, municipiul Iaşi
Telefon:
0232255961
Fax:
0232255960
Email:
contact@djadp.ro
Table of contents
Competent entities
Compartiment Avizare şi Control Trafic
Share your opinion
Provide your opinion about the content of this page. You can leave acomment about what we can improve. You will not receive a response toyour comment. Use the contact form to clarify any questions regardingthe information and services available on this portal.
Did you find what you were looking for?
Help us improve