Available procedures

PROCEDURA
Companii
National

License request for public lighting service no. 20*

Request for license for the public lighting service, provided under the delegated management method by specialized providers established as commercial companies - https://www.anrsc.ro/gestiune-delegata-iluminat-public/

Resolution time: 60 days from the registration of the documentation or 30 days from the submission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant an address informing them of the obligation to make additions, corrections or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the address requesting additions, the applicant does not provide all the corresponding documentation stipulated by the regulation, including the requested additions, A.N.R.S.C. will return the corresponding documentation and will delete the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) convening, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects arising/not arising from the documentation provided; b) verification, on site, of the reality of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialty department, prepares a specialty report which includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission, by the commission secretary.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

Granting/rejecting the license is done by order of the president of A.N.R.S.C..

In case the license is granted, A.N.R.S.C. communicates to the applicant the fiscal invoice concerning the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation, A.N.R.S.C. sends to the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and its associated conditions.

In case the 30-day deadline for paying the license granting fee is not respected, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of the license accompanied by the reasons for refusal.

In situations where the granting of the license has been rejected, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the deletion of the request from the procedure.

Notification deadline upon the expiration of the resolution term: 5 days from the confirmation of payment of the license granting fee in case of license granting, respectively 5 days from the issuance of the order rejecting the license.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Request for license for public sewer service no. 12*

License request for the public sewerage service, provided under the delegated management method by specialized providers established as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, with reference to the application and the submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the request for additions, the applicant does not provide all the relevant documentation provided by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation, cancelling that application from the licensing procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the A.N.R.S.C. headquarters, the applicant’s authorized representatives, to clarify certain aspects that arise/do not arise from the documentation provided;

b) to check, on site, the accuracy of the data in the documentation transmitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialist report which includes the justified proposal for the granting/rejection of the license and which will be presented for analysis to the Licensing Commission, by the commission secretary.

The proposal to grant/reject the license is voted on within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of the invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not met, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license, accompanied by the reasons for the refusal.

For situations in which the granting of the license was refused, the applicant may not submit new licensing documentation earlier than 6 months from the date of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the associated conditions;

b) Order rejecting the license, accompanied by the reasons for the refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon the expiry of the resolution term: 5 days from the date of payment confirmation of the license granting fee, in case of granting the license, or 5 days from the issuing date of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for public water supply service no. 06*

Request for license for the public water supply service, provided via delegated management by commercial companies with fully public capital - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in the case where necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, referring to the application and the submitted documents, within 30 days from the registration of the documentation.

In case within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, cancelling the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the justified proposal for granting/rejection of the license and which will be presented for analysis to the Licensing Commission by the commission secretary.

The proposal for granting/rejection of the license is submitted to vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In case of the granting of the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of the invoice communication.

After payment confirmation A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and the conditions associated with it.

In case of non-compliance with the 30-day deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of the license, accompanied by the reasons for the refusal to grant.

In the case where the license granting is rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuing the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of rejection of the license, accompanied by the reasons for the refusal to grant;

c) Notification regarding the cancellation of the application from the procedure.

Notification deadline after the resolution deadline: 5 days from the date of confirmation of payment of the license granting fee, in the case of granting the license, or 5 days from the date of issuance of the order refusing the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for public water supply and sewerage service no. 01*

License request for the public water supply and sewerage service, provided/supplied through the method of direct management by public services of local or county interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-apa-canal/

Settlement time: 60 days from the registration of the documentation or 30 days from the submission by the public utilities service operator of the supplements requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notification informing of the obligation to make additions, corrections, or clarifications, regarding the request and the submitted documents, within 30 days from the registration of the documentation.

In case , within 30 days from the issuance of the notification for supplements, the applicant does not provide all the corresponding documentation required by the regulation, including the requested supplements, A.N.R.S.C. will return this documentation and remove the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the A.N.R.S.C. headquarters, of the applicant’s authorized representatives, to clarify certain aspects that arise/do not arise from the provided documentation;

b) verification, on site, of the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report, which includes the justified proposal to grant/reject the license and which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal for the granting/rejection of the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is done through an order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. sends the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of the communication of the invoice.

After confirming the payment, A.N.R.S.C. sends the applicant within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the concepts license accompanied by the license and its associated conditions.

In case the 30-day term for paying the license granting fee is not respected, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. refusing the license, accompanied by the reasons for denying the granting.

In the situation in which the license has been rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issue of the order of refusal.

Final document:

a) Order to grant the license, accompanied by the license and the conditions associated with the license;

b) Order to reject the license, accompanied by t he reasons for refusal;

c) Notification regarding the removal of the request from the procedure.

Notification deadline at returning from the settlement term: 5 days from the date of confirmation of payment of the license granting fee, in the case of license granting, or 5 days from the date of issuing the license refusal order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for public lighting service no. 17*

Request for license for the public lighting service, provided by direct management by local or county public services of local interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-iluminat-public/

Resolution time: 60 days from the registration of the documentation or 30 days from the date when the public utility service operator sends the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make completions, corrections, or clarifications regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If , within 30 days from the date of the request for completions letter, the applicant does not provide all the required documentation as per the regulation, including the requested completions, A.N.R.S.C. will return the related documentation, removing the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on traduci doar ce scrie, nu adaugi nimic in plus, nu modifici nimic in ce tine de tagurile de htmlthe presentation and the complexity of the information contained in the applicant's submitted documentation, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that emerge/do not emerge from the submitted documentation;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Committee, by the secretary of the committee.

The proposal for manner of granting/rejecting the license is submitted to a vote within the Licensing Committee.

Granting/rejecting the license is done by order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. communicates to the applicant the invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After the payment confirmation A.N.R.S.C. sends the applicant, within a maximum of 5 days, the order of the president of A.N.R.S.C. for the granting of the license accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day term for the payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from the issuance, the order of the president of A.N.R.S.C. rejecting the license accompanied by the reasons for the refusal.

In the situation where the granting of the license is rejected, the applicant can no longer submit new licensing documentation sooner than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of rejection of the license, accompanied by the reasons for refusal of better translation;

c) Notification regarding the removal of the application from the procedure.

Notification and response time after expiration of the resolution deadline: 5 days from the strip date of payment confirmation of the license granting fee, if the license is granted, or 5 days from the date of issuance of the license rejection order.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in case of termination of certain management delegation contracts no. 01*

The documents submitted by the applicant for the purpose of modifying the license or modifying the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications regarding the application and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, removing the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning the authorized representatives of the applicant to the A.N.R.S.C. headquarters, to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the validity of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal to modify the license or the conditions associated with the license and which will be presented for analysis to the Licensing Commission, by the commission secretary.

The proposal to modify the license or the conditions associated with the license is subject to a vote within the Licensing Commission.

Notification Deadline upon expiration of the resolution deadline: 5 days from the date of issuance of the order by the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in the case of awarding other management delegation contracts no. 03*

Resolution time: 30 days from the registration of the documentation or 30 days from the submission by the public utility services operator of the additions requested by A.N.R.S.C.

The documents submitted by the applicant for the modification of the license or for the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications regarding the request and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation to the applicant, cancelling the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on the way the information is presented and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the provided documentation; b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the justified proposal for modification of the license or the conditions associated with the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to modify the license or the conditions associated with the license is subject to a vote within the Licensing Commission.

Notification deadline upon expiration of the resolution period: 5 days from the date of issuance of the order by the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

Withdrawal of the license in case of expiration or termination of the management delegation contract/contracts or revocation of the administration decision no. 01*

Resolution time: 15 days from the registration of the documentation or 15 days from the submission by the public utility service operator of the additions requested by A.N.R.S.C.

The documents submitted by the applicant for the withdrawal of the license or the withdrawal of the permission to provide/supply the service/activity in an administrative-territorial unit are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant an address informing them of the obligation to make additions, corrections, or clarifications, with reference to the application and the documents submitted, within 5 days from the registration of the documen

If, within 30 days from the date of the request for additions, the applicant does not provide all the relevant documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, cancelling the respective request from the license withdrawal procedure or withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that emerge/do not emerge from the documentation provided; b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, drafts a specialized report that includes the justified proposal for the withdrawal of the license or the withdrawal of the permission to provide/supply the service/activityin an administrative-territorial unit and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to withdraw the license or to withdraw the permission to provide/supply the service/activityin an administrative-territorial unit is submitted to a vote within the Licensing Commission.

in an administrative-territorial unit is done by order of the president of A.N.R.S.C., which will be transmitted to the license holder within a maximum of 5 days from the date of issuance.

Notification term upon expiration of the resolution term: 5 days from the date of issuance of the president's order of A.N.R.S.C..

*
PROCEDURA
Companii
National

Modification of the license as a result of extending the validity period of the management delegation contract no. 02*

Resolution time: 30 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Documents submitted by the applicant for the modification of the license or the modification of the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications regarding the application and the submitted documents, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the necessary documentation as provided by the regulation, including the requested additions, A.N.R.S.C. will return to the applicant the respective documentation, deleting the application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the documentation provided; b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialty report that includes the justified proposal for the modification of the license or of the conditions associated with the license, and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for the modification of the license or the conditions associated with the license is subjected to a vote within the Licensing Commission.

Notification period upon the expiration of the resolution term: 5 days from the date of issuance of the order by the president of A.N.R.S.C..

*
PROCEDURA
Companii
National

Changing the license in case of modification of the identification data of license holder no. 01*

Resolution time: 30 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the completions requested by A.N.R.S.C.

The documents submitted by the applicant for the purpose of amending the license or amending the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a notice informing them of the obligation to provide additions, corrections, or clarifications regarding the application and the documents submitted, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, removing the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, in order to clarify certain aspects arising/not arising from the documentation provided; b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal to amend the license or the conditions associated with the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to amend the license or the conditions associated with the license is submitted to a vote within the Licensing Commission.

Notification period upon expiration of the resolution time: 5 days from the date of issuance of the A.N.R.S.C. president's order.

*
PROCEDURA
Companii
National

Request for license for public sewerage service no. 10*

Request for license for the public sewerage service, provided in the form of delegated management by companies with entirely public capital - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in cases where necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation specified by the regulation, including the requested additions, A.N.R.S.C. will return the corresponding documentation, striking out the respective application from the licensing procedure, communicating this decision to the applicant.

Depending immune upon the way of submission and complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the submitted documentation;

b) checking on site the reality of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialty report including the justified proposal to grant/reject the license, which will be presented for analysis to the Licensing Commission, by the commission’s secretary.

The proposal to grant/reject the license is submitted to a vote in the Licensing Commission.

Granting/rejecting the license is made by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation A.N.R.S.C. sends the applicant within maximum 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for payment of the licensing fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from the boysuance, the president's order of A.N.R.S.C. rejecting the license, accompanied by the reasons for the refusal.

In situations where the granting of the license was refused, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of rejection of the license, accompanied by the reasons for refusal;

c) Notification regarding the striking out of the application from the procedure.

Notification period upon expiration of the processing period: 5 days from the confirmation of payment of the license granting fee, if the license is granted, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for public lighting service no. 18*

License application for the public lighting service, provided under the direct management method by companies with fully public capital - https://www.anrsc.ro/gestiune-directa-iluminat-public/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities operator of the requested completions by A.N.R.S.C.

Procedure description : The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing the obligation to make additions, corrections or clarifications, with reference to the application and the submitted documents, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the documentation required by the regulations, including the requested additions, A.N.R.S.C. will return to him the related documentation, removing the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the applicant’s authorized representatives, to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the authenticity of the data from the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report that includes the reasoned proposal for granting/rejection of the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is submitted to vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. sends the applicant the tax invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirmation of payment, A.N.R.S.C. transmits to the applicant in maximum 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and the associated conditions.

In case of not fulfilling the 30-day term for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within maximum 5 days from issuance, the order of the president of A.N.R.S.C. of rejection of the license accompanied by the reasons for refusal.

For the situation where the license granting has been rejected, the applicant can no longer submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) License granting order, accompanied by the license and the conditions associated with the license;

b) Order of rejection of the license, accompanied by the reasons for refusing the granting;

c) Notification regarding the removal of the application from the procedure.

Notification term at the expiration of the resolution term: 5 days from the date of confirmation of the payment of the license granting fee, in the case of granting the license, respectively 5 days from the date of issuing the order for refusing the license.

*
PROCEDURA
Companii
National

License request for public water supply service no. 07*

License request for the public water supply service, provided in the form of delegated management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution cases: 60 days from the registration of documentation or 30 days from the transmission by the public utility services operator of the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority will send the applicant a letter informing the obligation to make completions, corrections or clarifications, regarding the application and the submitted documents, within 30 days from the registration of the documentation.

In case within 30 days from the date of the request letter for completions, the applicant does not provide all appropriate documentation required by the regulation, including the requested completions, A.N.R.S.C. will return to them the corresponding documentation, striking off the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on the presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant to clarify certain aspects that result/do not result from the documentation provided;

b) on-site verification of the reality of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the substantiated proposal to grant/reject the license and which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal for granting/rejecting the license is put to the vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of the invoice communication.

After confirming the payment, A.N.R.S.C. sends to the applicant within maximum 5 days, the order of the president of A.N.R.S.C. for granting the license accompanied by the license and the associated conditions.

In case of non-compliance with the deadline of 30 days for paying the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends to the applicant within maximum 5 days from the issuance, the order of the president of A.N.R.S.C. of rejection of the license accompanied by the reasons for the refusal of granting.

For the situation where the granting of the license was rejected, the applicant cannot submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and the conditions associated with the license;

b) Order for rejection of the license, accompanied by the reasons for the refusal of granting;

c) Notification regarding the deletion of the application from the procedure.

Notification period upon expiry of chart time: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, respectively 5 days from the date of issuance of the order to reject the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for a license for public sewerage service no. 09*

License request for the public sewerage service, provided by direct management by public services of local or county interest, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units -
https://www.anrsc.ro/gestiune-directa-apa-canal/

Time for resolution: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to submit additions, corrections or clarifications, regarding the request and the submitted documents, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the request for completions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested completions, A.N.R.S.C. will return to the applicant the related documentation, removing the respective request from the license granting procedure, informing the applicant of this decision.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to convene, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation made available;

b) on-site verification of the accuracy of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized directorate, draws up a specialized report which includes the justified proposal to grant/reject the license and which will be submitted for analysis to the licensing Commission, by the secretary of the commission.

The proposal to grant/reject the license is put to vote within the Licensing Commission.

The granting/rejecting of the license is done by order of the president of A.N.R.S.C.

In case of granting the Cicense, A.N.R.S.C. informs the applicant of the tax invoice regarding the license fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirmation of payment, A.N.R.S.C. sends to the applicant within a maximum of 5 days, the order of the president of A.N.R.S.C. granting the license accompanied by the license and the related conditions.

In case of failure to comply with the 30-day deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends to the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license accompanied by the reasons for refusal.

In the case where the license granting was rejected, the applicant cannot submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order of granting the license, accompanied by the license and the conditions associated with the license;

b) Order of rejection of the license, accompanied by the reasons for non-granting;

c) Notification regarding the removal of the request from the procedure.

Deadline for Notification upon expiration of the settlement term: 5 days from the date of confirmation of the payment of the license granting fee, in case of granting the license, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for sanitation service no. 16*

Request for license for the public sanitation service of localities or for one or more specific activities of this service, provided in the form of delegated management by specialized providers established as commercial companies - https://www.anrsc.ro/gestiune-delegata-salubrizare/

Resolution time: 60 days from the registration of the documentation or 30 days from the date the public utility services operator submits the requested additions to A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant an address notifying the obligation to make additions, corrections, or clarifications, with reference to the application and submitted documents, within 30 days from the date of registration of the documentation.

If , within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, deleting that application from the license granting procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the submitted documentation;

b) verification, on site, of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report which includes a justified proposal for the granting/rejection of the license and which will be submitted for analysis to the Licensing Commission by the commission's secretary.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C.

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment is confirmed, A.N.R.S.C. sends the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. for granting the license accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not met, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. to reject the license, together with the reasons for the refusal.

In the event that the license is denied, the applicant may not submit new licensing documentation sooner than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the deletion of the application from the procedure.

Notification deadline at the expiry of the resolution period: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, or 5 days from the date of issuance of the order rejecting the license.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

Request for license for public lighting service no. 19*

Request for license for public lighting service, provided through direct management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-iluminat-public/

Solution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in cases where necessary, the regulatory authority sends the applicant an address informing them of the obligation to make additions, corrections or clarifications, referring to the application and the documents submitted, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, cancelling the respective request from the licensing procedure, communicating this decision to the applicant.

Depending on tolerance and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, in order to clarify certain aspects that result/do not result from the documentation made available;

b) on-site verification of the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialty department, prepares a specialty report which includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Committee by the committee secretary.

The proposal for granting/rejecting the license is submitted to a vote within the Licensing Committee.

The granting/rejecting of the license is done by order of the president of A.N.R.S.C..

In the event of granting the license, A.N.R.S.C. communicates to the applicant the tax invoice regarding the fee for granting the license, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirmation of payment, A.N.R.S.C. sends the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

In case of non-compliance with the 30-day deadline for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of track license, accompanied by the reasons for refusing to grant.

In the situation where the granting of the license was rejected, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by NB license and the associated conditions of the license;

b) Order rejecting the license, accompanied by the reasons for refusing to grant;

c) Notification regarding the removal of the application from the procedure.

Notification deadline at the expiration of the solution deadline: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, or 5 days from the date of issuance of the order rejecting the license.

Additional information https://www.anrsc.ro/front-page-iluminat-public/

*
PROCEDURA
Companii
National

Withdrawal of the permission to provide/supply the service/activity in the administrative-territorial unit Withdrawal of the permission to provide/supply the service/activity in the administrative-territorial unit no. 01*

Resolution time: 15 days from the registration of the documentation or 15 days from the transmission by the public utility services operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of withdrawing the license or withdrawing the permission to provide/deliver the service/activity in an administrative-territorial unit are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant an address informing them of the obligation to make additions, corrections or clarifications, regarding the request and the submitted documents, within 5 days from the registration of the documentation.

If, within 30 days from the date of the address requesting additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the corresponding documentation to the applicant, deleting the respective request from the license withdrawal or permission withdrawal procedure to provide/deliver the service/activity in an administrative-territorial unit, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide: a) the summoning, at the A.N.R.S.C. headquarters, of the authorized representatives of the applicant, to clarify certain aspects which arise/do not arise from the documentation provided; b) on-site verification of the reality of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialized report which includes the substantiated proposal for the withdrawal of the license or withdrawal of the permission to provide/deliver the service/activity in an administrative-territorial unit and which will be submitted for analysis to the Licensing Commission by the commission secretary.

The proposal for withdrawal of the license or withdrawal of the permission to provide/deliver the service/activity in an administrative-territorial unit is submitted for voting within the Licensing Commission.

The withdrawal of the license or withdrawal of the permission to provide/deliver the service/activity in an administrative-territorial unit is made by order of the A.N.R.S.C. president, which will be sent to the license holder within a maximum of 5 days from the date of issuance.

Notification deadline upon expiration of the resolution time: 5 days from the date of the issuance of the A.N.R.S.C. president's order.

*
PROCEDURA
Companii
National

Modification of the conditions associated with the license in case of extension of the validity period of some management delegation contracts no. 02*

Resolution time: 30 days from the registration of the documentation or 30 days from the date the utility services operator submits the additions requested by A.N.R.S.C.

The documents submitted by the applicant for the purpose of amending the license or modifying the conditions associated with the license granted for the public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter notifying the obligation to make additions, corrections, or clarifications, referring to the application and the documents submitted, within 15 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation to the applicant, deleting the request from the licensing procedure and notifying the applicant of this decision.

Depending on the presentation method and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon the authorized representatives of the applicant to the headquarters of A.N.R.S.C. to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through its specialized department, draws up a specialist report including the justified proposal for amending the license or the conditions associated with the license, which will be presented for analysis to the Licensing Commission by the commission's secretary.

The proposal for amending the license or the conditions associated with the license shall be subject to a vote in the Licensing Commission.

Notification deadline upon expiration of the resolution period: 5 days from the date of issuance of the A.N.R.S.C. president's order.

*
PROCEDURA
Companii
National

Request for license for sanitation service no. 13*

Request for license for the public sanitation service of localities or for one or more specific activities of this service, provided in the manner of direct management by local or county public interest services, with legal personality, established and organized by decisions of the deliberative authorities of the administrative-territorial units - https://www.anrsc.ro/gestiune-directa-salubrizare/

Resolution cord: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additional documents requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for granting the license for a public utility service/activity are analyzed by A.N.R.S.C., and in if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications regarding the application and the submitted documents, within 30 days from the registration of the documentation.

If , within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation provided by the regulation, including the requested additions, A.N.R.S.C. will return to them the related documentation, deleting the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, in order to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report that includes the justified proposal for granting/rejecting the license and which will be submitted for analysis to the Licensing Commission, by the commission secretary.

The proposal for granting/rejecting the license is put to a vote within the Licensing Commission.

Grantingstatus/rejection of the license is made by order of the president of A.N.R.S.C..

In the event of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation, A.N.R.S.C. sends the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. granting the license accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not met, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends to the applicant within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. of rejection of the license accompanied by the reasons for the refusal.

In case the license granting is rejected, the applicant can no longer submit new license documentation earlier than 6 months from the date of the order of rejection.

Final document:

a) Order for granting the license, accompanied by the license and the associated license conditions;

b) Order for rejection of the license, accompanied by the reasons for the refusal to grant it;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon expiration of the resolution term: 5 days from the date of confirmation of payment of the license granting fee, in the case of granting the license, respectively 5 days from the date of issuance of the order of rejection of the license.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

License request for the public water supply and sewerage service no. 02*

License application for the public water supply and sewerage service, provided under the direct management method by companies with fully public capital - https://www.anrsc.ro/gestiune-directa-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, with reference to the application and the submitted documents, within 30 days from the registration of the documentation.

In the event that, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the respective documentation, cancelling the respective application from the licensing procedure, communicating this decision to the applicant.

Depending on the presentation and complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, in order to clarify certain aspects that appear/do not appear from the submitted documents;

b) to verify, on site, the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialized report including the justified proposal for granting/rejecting the license, which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal for granting/rejecting the license is put to vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C.

In the case of granting the license, A.N.R.S.C. communicates to the applicant the invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After confirming the payment, A.N.R.S.C. sends to the applicant, within maximum 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and the conditions associated with it.

In case of non-compliance with the 30-day term for paying the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the event of refusal to grant the license, A.N.R.S.C. sends to the applicant, within maximum 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license, accompanied by the reasons for the refusal to grant it.

For the situation in which the license is refused, the applicant can no longer submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and its associated conditions;

b) Order for rejecting the license, accompanied by the reasons for refusing the grant;

c) Notification regarding the removal of the application from the procedure.

Notification period upon expiry of the resolution deadline: 5 days from the date of confirmation of payment of the license granting fee, in the case of granting the license, and 5 days from the date of issuing the rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for the public water supply and sewerage service no. 03*

License application for the public water supply and sewerage service, provided by direct management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the submission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description0: The documents submitted by the applicant for the purpose of granting a license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications regarding the request and the submitted documents, within 30 days from the registration of the documentation.

If , within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation, cancelling the respective application from the license granting procedure, announcing this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects arising/not arising from the documentation provided;

b) onsite verification of the reality of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a special report which includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission by the commission’s secretary.

The proposal for granting/rejecting the license is submitted for vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. informs the applicant of the fiscal invoice for the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant within maximum 5 days, the order of the president of A.N.R.S.C. granting the license together with the license and the associated conditions.

In case of non-compliance with the 30-day period for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within maximum 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license together with the reasons for refusal.

For the situation where the license granting is rejected, the applicant cannot submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order granting the license, accompanied by the license and the conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for refusal;

c) Notification regarding the cancellation of the application from the procedure.

Notification period upon expiry of resolution deadline: 5 days from the date of payment confirmation of the license granting fee, in case of granting the license, respectively 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

License request for sanitation service no. 15*

Request for license for the public sanitation service of localities or for one or more specific activities of this service, provided in the form of direct management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-directa-salubrizare/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, referring to the application and submitted documents, within 30 days from the registration of the documentation.

In case, within 30 days from the date of the request letter for additions, the applicant does not provide all the corresponding documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the corresponding documentation, cancelling the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the A.N.R.S.C. headquarters, authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the submitted documentation;

b) to conduct on-site verification of the accuracy of the data from the documentation submitted by the applicant.

A.N.R.S.C., through its specialized department, prepares a technical report that includes the justified proposal for granting/rejecting the license and which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal to grant/reject the license is subject to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In the case of license granting, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date the invoice is communicated.

After payment confirmation, A.N.R.S.C. sends the applicant within a maximum of 5 days, the order of the A.N.R.S.C. president for granting the license accompanied by the license and conditions associated with it.

In case of non-compliance with the 30 days term for payment of the license granting fee, A.N.R.S.C. will proceed with the withdrawal of the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the order of the A.N.R.S.C. president for the rejection of the license accompanied by the reasons for the refusal.

For the case in which the granting of the license was refused, the applicant may not submit new licensing documentation earlier than 6 months from the date of issuing the order of rejection.

Final document:

a) Order granting the license, accompanied by the license and conditions associated with the license;

b) Order rejecting the license, accompanied by the reasons for the refusal;

c) Notification regarding the cancellation of the request from procedure.

Notification deadline upon expiration of the resolution time: 5 days from the date of confirmation of payment of the license granting fee, in case of granting the license, respectively 5 days from the date of issuing the order of rejection.

Additional information: https://www.anrsc.ro/front-page-salubrizare/


*
PROCEDURA
Companii
National

Request for license for the public water supply service no. 08*

Request for license for the public water supply service, provided through the delegated management method by specialized providers established as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utility service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant an address by which it informs them of the obligation to make additions, corrections or clarifications regarding the application and submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the appropriate documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the respective documentation, deleting the respective request from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) convening, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant, to clarify certain aspects arising/not arising from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, prepares a specialty report that includes the justified proposal to grant/reject the license and which will be presented for analysis to the Licensing Commission, by the commission secretary.

The proposal to grant/reject the license is subjected to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case the license is granted, A.N.R.S.C. communicates to the applicant the invoice for the license granting fee, which must be paid within maximum 30 days from the date of communication of the invoice.

After payment confirmation A.N.R.S.C. sends the applicant within maximum 5 days, the order of the president of A.N.R.S.C. granting the license, accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not respected, A.N.R.S.C. will proceed to revoke the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant within maximum 5 days from issuance, the order of the president of A.N.R.S.C. rejecting the license, accompanied by the reasons for refusal.

In the situation where the license granting was rejected, the applicant can no longer submit new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order to grant the license, accompanied by the license and conditions associated with the license;

b) Order to reject the license, accompanied by the reasons for refusal;

c) Notification regarding the deletion of the request from the procedure.

Notification deadline upon expiry of the resolution term: 5 days from the date of payment confirmation of the license granting fee, in case of granting the license, respectively 5 days from the date of issuing the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for the public water supply and sewerage service no. 04*

Request for license for the public water supply and sewerage service, provided/operated under the delegated management modality by specialized providers set up as commercial companies-https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the supplements requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications, regarding the request and the submitted documents, within 30 days from the registration of the documentation.

In case that, within 30 days from the address for the request of additions, the applicant does not provide all the necessary documentation required by the regulations, including the requested additions, A.N.R.S.C. will return the respective documentation, canceling the request from the licensing procedure and communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, to the A.N.R.S.C. headquarters, the authorized representatives of the applicant, in order to clarify certain aspects that arise/do not arise from the documentation provided;

b) on-site verification of the accuracy of the data in the documentation sent by the applicant.

A.N.R.S.C., through its specialized department, prepares a specialist report which includes the justified proposal for the granting/rejection of the license and which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for the granting/rejection of the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the A.N.R.S.C. president.

In the case of granting the license, A.N.R.S.C. notifies the applicant of the invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of invoice notification.

After payment confirmation A.N.R.S.C. sends the applicant within a maximum of 5 days the order of the president of A.N.R.S.C. for granting the license, together with the license and its associated conditions.

In the case of non-compliance with the 30-day term for payment of the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In the case of refusal to grant the license, A.N.R.S.C. sends the applicant within a maximum of 5 days from issuance, the president of A.N.R.S.C.'s order of license rejection together with the reasons for the refusal.

In the situation where the granting of the license was rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, together with the license and the associated conditions of the license;

b) Order for rejection of the license, together with the reasons for the refusal;

c) Notification of cancellation of the request from the procedure.

Notification deadline upon expiration of processing term: 5 days from the date of confirmation of payment of the license granting fee, in the event of license granting, or 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for sanitation service no. 14*

Request for a license for the public sanitation service of localities or for one or more specific activities of this service, provided in the modality of direct management by companies with fully public capital - https://www.anrsc.ro/gestiune-directa-salubrizare/

Processing time: 60 days from the registration of the documentation or 30 days from cloud transmission by the public utility service operator regarding the completions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of the license for a public utility service/activity are analyzed by A.N.R.S.C., and in case it is necessary, the regulatory authority sends the applicant a notice informing them of the obligation to make additions, corrections or clarifications, regarding the application and the documents submitted, within 30 days from the registration of the documentation.

In case , within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation provided by the regulation, including the requested additions, A.N.R.S.C. will return the related documentation, striking out the respective application from the license granting procedure, communicating this decision to the applicant.

Depending on the way of presentation and the complexity of the information contained in inline documentation submitted by the applicant, A.N.R.S.C. may decide:

a) summoning, at the headquarters of A.N.R.S.C., the authorized representatives of the applicant, to clarify certain aspects that result/do not result from the documentation provided;

b) on-site verification of the reality of the data from the documentation submitted by the applicant.

A.N.R.S.C., through the specialized department, draws up a specialist report that includes the reasoned proposal for granting/rejection of the license which will be presented for analysis to the Licensing Commission, by the secretary of the commission.

The proposal for cost granting/rejection of the license is submitted to a vote within the Licensing Commission.

The granting/rejection of the license is made by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of communication of the invoice.

After payment confirmation, A.N.R.S.C. sends to the applicant in maximum 5 days, the order of the president of A.N.R.S.C. for granting the license accompanied by the license and the conditions associated with it.

In case of non-compliance with the 30-day term for paying the license granting fee, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from the issuance, the order of the president of A.N.R.S.C. for rejection of the license accompanied by the reasons for the refusal to grant.

For the situation in which the granting of the license was rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the date of issuance of the rejection order.

Final document:

a) License granting order, accompanied by the license and the conditions associated with the license;

b) License rejection order, accompanied by the reasons for the refusal to grant;

c) Notification regarding the deletion of the application from the procedure.

Notification period at the “expiry of the processing term”: 5 days from the date of confirmation of payment of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the license rejection order.

Additional information: https://www.anrsc.ro/front-page-salubrizare/

*
PROCEDURA
Companii
National

Request for license for public sewerage service no. 11*

Request for a license for the public sewerage service, provided in the manner of delegated management by commercial companies with the status of regional operators - https://www.anrsc.ro/gestiune-delegata-apa-canal/

Processing time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the granting of a license for a public utility service/activity are analyzed by A.N.R.S.C., and if necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections or clarifications, referring to the application and the submitted documents, within 30 days from the registration of the documentation.

If within 30 days from the date of the request for additions, the applicant does not provide all the required documentation as stipulated by the regulation, including the requested additions, A.N.R.S.C. will return the relevant documentation and remove the respective application from the license granting procedure, and will communicate this decision to the applicant.

Depending on the manner of submission and the complexity of the information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) to summon, at the A.N.R.S.C. headquarters, the authorized representatives of the applicant to clarify certain aspects that arise/do not arise from the provided documentation;

b) on-site verification of the accuracy of the data in the documentation submitted by the applicant.

A.N.R.S.C., through its specialized department, draws up a specialized report that includes a justified proposal to grant/reject the license, which will be presented for analysis to the Licensing Commission by the secretary of the commission.

The proposal to grant/reject the license is put to a vote within the Licensing Commission.

The granting/rejection of the license is done by order of the president of A.N.R.S.C..

In case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date of invoice communication.

After payment confirmation, A.N.R.S.C. sends the applicant, within a maximum of 5 days, the president's order granting the license, together with the license and its associated conditions.

If the 30-day term for paying the license granting fee is not respected, A.N.R.S.C. will proceed to withdraw the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the president's order rejecting the license, together with the reasons for refusal.

If the license granting is rejected, the applicant may not submit a new licensing documentation earlier than 6 months from the issuance of the rejection order.

Final document:

a) Order for granting the license, together with the license and its associated conditions;

b) Order for rejecting the license, together with reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon expiry of the processing period: 5 days from the date of payment confirmation of the license granting fee, in the case of license granting, or 5 days from the date of issuance of the order rejecting the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
PROCEDURA
Companii
National

Request for license for public water supply service no. 05*

Request for a license for the public water supply service, provided through direct management by public services of local or county interest, with legal personality, established and organized by decisions of the deliberative authorities of administrative-territorial units - https://www.anrsc.ro/gestiune-directa-apa-canal/

Resolution time: 60 days from the registration of the documentation or 30 days from the transmission by the public utilities service operator of the additions requested by A.N.R.S.C.

Procedure description: The documents submitted by the applicant for the purpose of granting a license for a public service/activity are analyzed by A.N.R.S.C., and in the event that it is necessary, the regulatory authority sends the applicant a letter informing them of the obligation to make additions, corrections, or clarifications regarding the application and submitted documents, within 30 days from the registration of the documentation.

If, within 30 days from the date of the request for additions, the applicant does not provide all the corresponding documentation required by the regulation, including the requested additions, A.N.R.S.C. will return the respective documentation, deleting the application from the license granting procedure, communicating this decision to the applicant.

Depending on the manner of presentation and the complexity of information contained in the documentation submitted by the applicant, A.N.R.S.C. may decide:

a) the summoning, at the A.N.R.S.C. headquarters, of authorized representatives of the applicant, to clarify certain aspects arising/not arising from the documentation provided;

b) verification, on-site, of the reality of the data from the documentation transmitted by the applicant.

A.N.R.S.C., through its specialized department, prepares a specialist report which includes the justified proposal for granting/rejecting the license and will be presented for analysis to the Licensing Commission by the Commission secretary.

The proposal for granting/rejecting the license is subject to a vote within the Licensing Commission.

Granting/rejecting the license is carried out by order of the president of A.N.R.S.C.

In the case of granting the license, A.N.R.S.C. communicates to the applicant the fiscal invoice regarding the license granting fee, which must be paid within a maximum of 30 days from the date the invoice is communicated.

After payment confirmation, A.N.R.S.C. sends the applicant within a maximum of 5 days, the order of the president of A.N.R.S.C. for granting the license, accompanied by the license and its associated conditions.

If the 30-day deadline for payment of the license granting fee is not respected, A.N.R.S.C. will proceed with the withdrawal of the license.

In case of refusal to grant the license, A.N.R.S.C. sends the applicant, within a maximum of 5 days from issuance, the order of the president of A.N.R.S.C. for rejection of the license, accompanied by the reasons for refusal.

In case the license granting is rejected, the applicant may not submit a new licensing documentation less than 6 months from the date of issuance of the rejection order.

Final document:

a) Order for granting the license, accompanied by the license and the conditions associated with the license;

b) Order for rejection of the license, accompanied by the reasons for refusal;

c) Notification regarding the removal of the application from the procedure.

Notification deadline upon expiration of the resolution period: 5 days from the date of payment confirmation of the license granting fee, in the case of granting the license, respectively 5 days from the date of issuance of the rejection order of the license.

Additional information: https://www.anrsc.ro/front-page-apa-si-canalizare/

*
National Regulatory Authority for Community Public Utility Services*
Str. Lucian Blaga, nr. 4, Sectorul 3
Telefon: 0213179751
Fax: 0213179752
Email: cabinet@anrsc.ro

Assistance services

There are no Assistance services registered by this institution

Institutional structure

Autoritatea Naţională de Reglementare pentru Servicii Comunitare de Utilităţi Publice
Direcţia reglementări, autorizări, prețuri și tarife

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro