Single digital gateway for public services
favorite_border

Issuance of construction permit for technical and utility networks extension / connection to electrical networks - Constanța City Hall*

favorite_border
Add favorite
Procedure
Offline
Companii
Cetateni
National

This procedure regulates the method of issuing the construction double authorization for technical-utility networks extension / electric network connection within Constanța City Hall

SPECIFICATION:
In the case where network extensions are requested by possibility E-DISTRIBUȚIE DOBROGEA S.A., the ownership document, cadastral documents, and land register excerpt will not be submitted.
*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
Request form and annexes*
Descarcă
Formular tipizat
- completed, signed and stamped, as the case may be, the annex to the application for building permit will be signed and stamped by the designer, on behalf of SC E-Distributie Dobrogea SA, form F8 – average completion time 5-6 min*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Opis*
Descarcă
Scanned document
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The valid urbanism certificate*
Descarcă
Scanned document
copy*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Property deed*
Descarcă
Scanned document
certified copy*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Land registry excerpt*
Descarcă
Scanned document
updated to date*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Cadastral plan*
Descarcă
Scanned document
of the property where the equipment related to the network/connection will be positioned*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The permits and approvals requested by the urbanism certificate within the validity period*
Descarcă
Scanned document
copy*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Sketch for public domain restoration*
Descarcă
Scanned document
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Project, reviewed by the project verifier, if applicable*
Descarcă
Scanned document
- written documents (technical report) and drawn documents (work location plan at scales 1:10,000, 1:5,000, 1:2,000, or 1:1,000, as appropriate, issued by OCPI - 2 copies, and site plan drawn in the 1970 Stereographic Projection system, at scales 1:2,000, 1:1,000, 1:500, 1:200, or 1:100, as appropriate, endorsed by OCPI on which the existing and proposed network will be represented in color), technical documentation verification report (if applicable). Each sheet will have a title block in the lower right corner containing: the name of the company or the designer, the registration number or authorization number, as applicable, the title of the project and of the sheet, the project and sheet number, the date of preparation, the names, roles, and signatures of the preparers and of the project manager.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Tax*
Descarcă
Scanned document
13 lei for a connection, 1 from the value of the estimate without VAT for extensions*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
statement-consent*
Descarcă
Formular tipizat
-according to the provisions of Regulation (EU) No. 679/2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Issued documents

Denumire

Tip document

Descarcă


-
building permit*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
15
Calendar days
Notification deadline:
15
Calendar days
Appeal routes
In the event of a dispute between the beneficiary and the competent authority, the provisions of common law shall apply.
*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
12 January 2026
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Constanta Municipality City Hall*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
Constanta Municipality City Hall*
B-dul Tomis, nr. 51
Telefon: 0241 488 100
Fax: 0241 488 195
Email: primarie@primaria-constanta.ro
Table of contents

Competent entities

Serviciul Autorizari Constructii- Primăria Constanța

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro