SRI approval notice for the approval of urban planning documentation (PUG, PUZ, PUD)*

favorite_border
Add favorite
Procedure
Online
Companii
Cetateni
Institutii
National

The Romanian Intelligence Service approves urban planning documentation (P.U.D., P.U.D., P.U.G.), the request can be made by any natural person, legal entity, or public institution, provided that the SRI approval is requested through the urban planning certificate.

The Romanian Intelligence Service reserves the right to request the completion of the documentation, in certain cases, with other documents besides those presented in the procedure.

*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
Request for permit*
Descarcă
Formular tipizat
The request form provided will be completed.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Urbanism certificate and/or suitability opinion*
Descarcă
Scanned document
The Urbanism Certificate (copy), within the validity period, and/or the opportunity opinion (copy) by which the approval of the Romanian Intelligence Service is requested.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Power of attorney for representation (if applicable)*
Descarcă
Scanned document
The power of attorney will be attached as a scanned copy.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Land register excerpt and/or the site plan approved by OCPI*
Descarcă
Scanned document
The land register excerpt of the property (copy) targeted by the works, issued by OCPI no more than 30 days prior to submission.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Coordinate inventory*
Descarcă
Scanned document
Inventory of coordinates for the site boundaries, its surface area, and the outline of the existing constructions on the site, as well as the outline of the building bodies targeted by the investment, or, as the case may be, the .DXF file containing the aforementioned data.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Proof of title over the land and/or constructions*
Descarcă
Scanned document
Documents attesting the beneficiary's right of ownership or possession (copy).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The technical memorandum*
Descarcă
Scanned document
It will include at least: project name; initiator (beneficiary); developer (designer), sub-designer, collaborators; date of elaboration. Object of the work Zoning Conclusions from already prepared documentation: Conclusions from simultaneously prepared documentation Existing situation*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
BOARD 1 - Existing situation*
Descarcă
Scanned document
It will include: the boundary of the area or site studied; existing buildings; property boundaries; streets, with their names and associated sidewalks; the way the land is used, with a presentation of functions; names of existing institutions; pedestrian and vehicle access; arranged parking lots and garages; building height; building structure: durable (brick masonry, stone, concrete floors), semi-durable (brick masonry, stone, wooden floors), non-durable (wattle and daub, adobe, wood).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
PLANŞA 2 - Urban planning regulations*
Descarcă
Scanned document
It will mainly include: the boundary of the proposed built-up area (as applicable); the boundary of the studied area; parcel boundaries; boundaries of the protection zone (as applicable); existing constructions to be retained; the purpose of the proposed objectives; alignment of the constructions; height of the constructions; indices for land occupation and use (P.O.T., C.U.T.); proposed road traffic, including parking garages with respective accesses; pedestrian circulation; characteristic profiles of streets and pedestrian alleys (existing-proposed).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Issued documents

Denumire

Tip document

Descarcă


-
The approval of the Romanian Intelligence Service*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
15
Calendar days
Case filling duration:
5
Calendar days
Notification deadline:
5
Calendar days
Appeal routes

In the case of a dispute between the beneficiary and the competent authority, the provisions of common law are applicable.

*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
13 August 2024
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Romanian Intelligence Service*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
Romanian Intelligence Service*
B-dul LIBERTĂȚII nr. 14
Telefon:
Fax:
Email: RELATII@SRI.RO
Table of contents

Competent entities

Serviciul Român de Informații - avizare urbanism

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro