URBANISM - REQUEST for issuing the building/demolition permit*

favorite_border
Add favorite
Procedure
Offline
Companii
Cetateni
National

The execution of construction works is allowed only based on a building permit, as regulated by Law no. 50/1991 regarding the authorization of construction works execution, republished with subsequent amendments and additions.

The building/demolition permit is the document that grants citizens the right to build, as well as to consolidate/repair/demolish an already existing construction. This document is issued by the Sector 4 City Hall of Bucharest, through the General Directorate of Urbanism and Land Planning, based on a file that includes a series of approvals, agreements, technical project, is valid for a maximum of 12 months from the date of issue and can be extended for another 24 months.

According to the regulatory act, the building permit is issued at the request of the holder of a real right (ownership, use, usufruct, superficies, easement, etc.) over an estate (land and/or buildings), in compliance with the provisions of spatial planning and urban documentation.
Law no. 50/1991 also stipulates a series of cases in which a building permit is not required according to art. 11.

For the issuance of the building/demolition permit, the applicant shall create an account on the platform start.ps4.ro where an application for the issuance of the building/demolition permit will be submitted.

The value of the fee for issuing the building/demolition permit is established by the Fiscal Code, art. 267 and by decision of the General Council of the Municipality of Bucharest (HCGMB) and is calculated as follows:
- Individuals – developed area (built surface) x zone coefficient (A, B, C, D results from CU) x 1.129/m2
- Legal entities – the estimate calculated by the beneficiary is considered:
· for collective housing – estimate*0.5%
· for other destinations - estimate*1.0%
The fee can be paid by payment order in the account RO70TREZ70421160203XXXXX TREZORERIA SECTORULUI 4, SECTORUL 4 AL MUNICIPIULUI BUCUREȘTI, CUI 4316422, at SelfPay machines or online when submitting the application.
Failure to start the works or to complete them within the established deadlines leads to the expiration of the permit validity, requiring the issuance of a new building/demolition permit. If the characteristics do not change compared to the initial permit, a new building permit can be issued without the need for a new urbanism certificate.

Information regarding THEME MODIFICATION and SITE ORDER

By theme modification, according to the definition in annex no. 2 Law 50/1991 - any change initiated by the investor/owner which concerns the characteristic functions and/or functional capacities, approved technical-economic indicators, spatial and/or placement solutions and other such requirements, which formed the basis for the development of the technical documentation - D.T. that was the basis for issuing the building permit.
According to the provisions of art.7, para. 15 of Law 50/1991, if during the execution of the works and only during the validity period of the building permit theme modifications occur regarding the authorized construction works, which lead to the need to modify them, the holder is obliged to request a new building permit, according to the provisions of this law.
For obtaining a new building permit, according to the provisions, the applicant shall submit new technical documentation - D.T. elaborated according to the occurred theme modifications, and the competent local public administration authority shall decide, as the case may be:
a) issuance of the new building permit, if the works related to the theme modifications fall within the limits of the administrative act of the competent environmental authority, as well as the approvals and agreements obtained for the initial building permit;
b) the resumption of the authorization procedure under this law, if the works related to the theme modifications exceed the limits of the administrative act of the competent environmental authority, as well as the approvals and agreements obtained for the initial building permit.
The verification of compliance of the works related to the theme modifications with the approvals and agreements obtained for the initial building permit is carried out by the specialized structures of the competent public administration authority, as well as by certified project verifiers under the law, for each essential quality requirement in constructions, with the participation of representatives of the approving institutions.
The verification of compliance of the works related to the theme modifications with the administrative act of the competent environmental authority is carried out by it according to the provisions of the legislation regarding the environmental impact assessment of certain public and private projects.
For transport infrastructure projects of national interest, the verification of the compliance of design theme modification works with the approvals and agreements obtained for the initial building permit is carried out by the Ministry of Transport, as well as by certified project verifiers under the law, for each essential quality requirement in constructions, with the participation of representatives of the approving institutions affected by the changes. The summoning of the representatives of the approving institutions is done by the Ministry of Transport. The minutes of the meeting together with all legally required documents form the basis for issuing the building permit.

According to the methodological norms for the application of Law no. 50/1991 on the authorization of construction works from 12.10.2009, based on the site order issued by the project designer and checked by a certified project verifier under the law, as well as with the written agreement of the beneficiary/investor/administrator/project manager, as applicable, local modifications of the technical solutions in the authorized technical documentation - D.T. may be allowed without issuing a new building permit, if:
a) the function stated in the initial permit is not changed;
b) compliance with the provisions of the approvals/agreements/the point of view of the competent authority for environmental protection, as well as its administrative act, if applicable, annexed to the initial permit is ensured;
c) compliance with the provisions of the Civil Code;
d) placement conditions are not changed (height regime, POT, CUT, alignment, minimum distances to property boundaries, or the aspect of the construction);
e) the resistance and stability of neighboring buildings are not endangered;
f) compliance with the provisions of technical regulations in the field of fire safety is ensured;
g) energy efficiency is ensured.
They fit within the provisions and works that become necessary in special cases determined by unforeseen situations at the design stage (as a result of decappings, foundation surveys, etc.), carried out on existing constructions, including historical monuments (with the approval of the competent bodies of the Ministry of Culture and Religious Affairs).
In the situations provided above, responsibility for the technical correctness of the modifying solution lies with the designer, jointly with the project verifier/verifiers, and the permit holder is obliged to submit (in copy) to the permit issuer the specified documentation and/or documents, as evidence.
*
Entitled persons
Regulated professions
Required documents

Denumire

Descriere

Obligatoriu

Semnătură digitală

Tip document

Descarcă


-
Application form filled in completely and correctly + WORK INDEX*
Descarcă
Formular tipizat
Form – REQUEST for the issuance of the building/demolition permit, in accordance with the instructions regarding its completion.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Urbanism Certificate*
Descarcă
Scanned document
The Urbanism Certificate and the plans endorsed not to be altered (copy).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Identification elements of the building for which the AC is requested*
Descarcă
Scanned document
Deed of ownership/Proof of title over the real estate, land and/or buildings (in accordance with the original).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Land Registry Extract*
Descarcă
Scanned document
Land Register Extract of information updated to date issued, upon request, by the National Agency for Cadastre and Real Estate Publicity (ANCPI) (copy).*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fiscal role certificate*
Descarcă
Scanned document
Sure! Please provide the Romanian text you would like me to translate.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Permits and agreements regarding urban utilities*
Descarcă
Scanned document
Permits and agreements regarding urban utilities: a) water supply + annexed plans; b) sewage + annexed plans; c) electricity supply + annexed plans; d) natural gas + annexed plans; e) telephony + annexed plans; f) sanitation; g) urban transport + annexed plans; Permits/agreements for connections: -Work execution schedule approved by the area administrator; -Contract under which the works are carried out; -Pavement restoration contract (if applicable); -LUXTEN permit (if applicable); -NET CITY TELEKOM permit (if applicable); -Traffic Police Brigade permit – during execution, in case the connections/branchings will be made on public domain*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
The neighbor's consent in legalized form*
Descarcă
Scanned document
The neighbor's consent in legalized form (according to the original) - if applicable*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Other agreements*
Descarcă
Scanned document
Other agreements: a) environmental protection; b) fire safety; c) civil protection; d) population health.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Other permits/agreements specific to public administration*
Descarcă
Scanned document
Other permits and approvals specific to public administration: - Fire safety + plans stamped for no changes (annex); - Civil protection + plans stamped for no changes (annex); - Population health; - Permits/approvals specific to central public administration and/or their decentralized services (copy) – permits/approvals requested through the Urbanism Certificate; - Specialized studies (1 original copy) - all studies requested through the Urbanism Certificate; - The viewpoint/administrative act of the competent environmental protection authority (copy); - Payment documents (copy): architectural stamp and proof of payment of the construction/demolition authorization issuance fee.*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Project for authorizing the works*
Descarcă
Scanned document
Project for works authorization - D.T.A.C. (2 original copies) A1. Architecture Report A2. Verification Report A3. Drawings B1. Structural Report B2. Verification Report B3. Drawings C1. Electrical Installations Report C2. Verification Report C3. Drawings D1. Thermal Installations Report D2. Verification Report (if applicable) D3. Drawings E1. Sanitary Installations Report E2. Verification Report (if applicable) E3. Drawings*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Issued documents

Denumire

Tip document

Descarcă


-
Building/Demolition Permit*
Document obligatoriu
Semnatură digitală obligatorie
Se poate obține prin OOTS
Fees

Title

Payment method

Value

Currency


None
Deadlines
Resolution time:
30
Calendar days
Case filling duration:
10
Calendar days
Notification deadline:
0
Calendar days
Appeal routes

In the case of a dispute between the beneficiary and the competent authority, the provisions of common law are applicable.

*
Additional information
More info:
Links
None
Assistance and problem-solving services
None
Last updated: 
12 March 2025
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
Institution responsible with document: 
Publicat de către: 
A paragraph is a self-contained unit of a discourse in writing dealing with a particular point or idea. Paragraphs are usually an expected part of formal writing, used to organize longer prose.
City Hall of Bucharest's District 4*
*Content marked with an asterisk (*) has been automatically translated and may not fully reflect the original meaning. For objective interpretation, please consult the Romanian version.
City Hall of Bucharest's District 4*
Strada George Coșbuc, nr. 6-16, cod poștal 040531
Telefon: 0219441
Fax:
Email: contact@ps4.ro
Table of contents

Competent entities

DIRECȚIA GENERALĂ DE URBANISM ȘI AMENAJAREA TERITORIULUI

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro