National Regulatory Authority for Energy*

Available procedures

PROCEDURA
Companii
National

Certification of economic operators who design, execute and inspect electrical installations*

Certification of economic operators carrying out activities of design, execution, and verification of electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure of economic operators in the field of electric energy can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Companii
National

Periodic verification and approval of the certificate granted to economic operators who design, execute, and inspect electrical installations.*

Periodic verification and endorsement of the certificate granted to economic operators carrying out activities of design, execution, and verification of electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure for economic operators in the field of electricity can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Companii
Cross-border

The provision of cross-border services, of an occasional/temporary nature, by economic operators, foreign legal entities, registered in an EU/EEA/Switzerland member country*

Provision of cross-border services, of an occasional/temporary nature, for carrying out works on electrical installations within the SEN or those isolated by economic operators, foreign legal persons, registered in an EU/EEA/Switzerland member country, if they hold an equivalent document (corresponding to the types of authorizations mentioned in the Regulation) issued by a similar body from the country of origin.

Information regarding the procedure for the authorisation of economic operators in the field of electricity can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Cetateni
National

Authorization for grade IVA without exam*

The authorization for grade IVA, without examination, of the principal design engineers from energy sector design institutes, who hold or have held grade I or similar, according to the COR Nomenclature, of professors/associate professors from faculties in the energy field, as well as researchers from institutes/centers in the energy field.

Information regarding the authorization procedure for electricians, project verifiers, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National

Visa authorized electrician certificate in the field of electrical installations*

Endorsing the authorized electrician certificate for carrying out, on the territory of Romania, with compliance to the applicable regulations and norms in force in the field of electrical energy, activities of designing and executing electrical installations.

Information regarding the authorization procedure for electricians, project validators, as well as technical quality experts and extrajudicial experts in the field of electrical installations can be found on the ANRE website and may be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Companii
National

Authorization of legal entities that install and/or operate heating cost allocation systems in condominium-type buildings*

The procedure refers to the authorization of legal entities that install and/or operate cost distribution systems for heating in condominium buildings. Applicants must submit documentation prepared in accordance with the provisions of Articles 7-9 of ANRE Order no.53/2017. The documentation submitted by applicants is analyzed by the Authorization Committee for legal entities that carry out installation and operation activities of cost distribution systems for heating and domestic hot water in condominium buildings.


*
PROCEDURA
Companii
National

Authorization of legal entities carrying out activities of installation and/or operation of cost allocation systems for domestic hot water in condominium-type buildings*

The procedure refers to the authorization of legal entities that install and/or operate cost allocation systems for heating in condominium-type buildings: Applicants must submit documentation prepared in accordance with the provisions of art.7, art.8, and art.10 of ANRE Order no. 53/2017. Documentation submitted by applicants is analyzed by the Authorization Committee for legal entities carrying out activities of installation and operation of cost allocation systems for heating and domestic hot water in condominium-type buildings. Within 30 days from the date of submission of the complete documentation, ANRE decides on the granting/refusal of the requested authorization(s).

*
PROCEDURA
Cetateni
National
Cross-border

Authorization without exam of natural persons carrying out activities in the natural gas sector*

The conditions, deadlines, and procedures for granting the status of authorized installer in the field of natural gas, without an exam, to specialized teaching staff from faculties in the fields of petroleum-gas, installations, civil and industrial constructions, or polytechnic, if they have at least 10 years of professional experience in a discipline within the field of natural gas or a related field.

Information regarding the procedure for granting the status of authorized installer in the field of natural gas, without an exam, can be found here


*
PROCEDURA
Companii
National

Extension of the validity of the authorization/authorizations granted to economic operators for the activities of design, execution, and operation of the objectives/systems/installations in the field of natural gas.*

The conditions, terms, and procedures for extending the validity of the authorization/authorizations granted to economic operators for the activities of design, execution, and operation of objectives/systems/installations in the field of natural gas.

*
PROCEDURA
Companii
National
Cross-border

Suspension of the authorization/authorizations held by authorized economic operators for the activities of design, execution, and operation of objectives/systems/installations in the field of natural gas*

The conditions, deadlines, and procedures for the suspension of authorizations for the design, execution, and operation activities of objectives/systems/installations in the field of natural gas.

*
PROCEDURA
Companii
National
Cross-border

Modification of the license/licenses for activities involving the design, execution, and operation of objectives/systems/installations in the field of natural gas*

The conditions, deadlines and procedures for modifying the authorizations for the activities of design, execution and operation of objectives/systems/installations in the field of natural gas.

*
PROCEDURA
Companii
National
Cross-border

Withdrawal of the authorization/authorizations held by the authorized economic operators for the activities of design, execution, and operation of the objectives/systems/installations in the field of natural gas*

The conditions, terms and procedures for the withdrawal of authorizations for activities related to the design, execution and operation of objectives/systems/installations in the field of natural gas.

*
PROCEDURA
Cetateni
National
Cross-border

Granting the status of project verifier to individuals who carry out the verification of technical projects in the natural gas sector*

The conditions, deadlines, and procedures for granting the status of project verifier to natural persons who carry out verification activities of technical projects for upstream supply pipelines related to production, for surface technological installations related to storage, for objectives/systems related to the transport and/or distribution of natural gas, for installations related to the production/storage activity of biogas/biomethane, as well as for liquefied natural gas (LNG) installations

The cumulative education and practical experience conditions in the natural gas sector required to participate in the certification exam as a project verifier are:

a) graduation from an accredited higher education institution, in the following profiles/specializations in engineering sciences: oil and gas, construction installations, other profiles/specializations related to technical activities in the natural gas sector;

b) experience as an ANRE authorized installer, authorization type PGT or PGD, depending on the type of certificate requested, of at least 6 years;

c) work experience in the natural gas sector, in design activity, depending on the type of certificate requested, of at least 8 years.

*
PROCEDURA
Companii
National

Issuance of duplicate for the authorizations/decisions for the extension of authorizations granted to legal entities carrying out activities of installation and/or operation of cost allocation systems for heating and domestic hot water*

The procedure refers to the process related to issuing a duplicate of the authorizations granted to legal entities that carry out installation and/or operation activities of cost allocation systems for heating and domestic hot water in condominium-type buildings.

*
PROCEDURA
Companii
National

Certification after deregistration of economic operators who design, execute, and inspect electrical installations.*

Certification within 30 days after deregistration of economic operators who design, execute, and verify connected electrical installations

to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure of economic operators in the field of electricity can be found on the ANRE website and can be accessed at the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Cetateni
Cross-border

Authorization for cross-border provision of services with a temporary/occasional character.*

Authorization of individuals established in EU/EEA/Switzerland member states for carrying out electrical installation design/execution work, based on the authorization granted in the country of origin, only for cross-border services of a temporary/occasional nature, indicating the service contract.

Information regarding the authorization procedure for electricians, project inspectors, as well as quality and extrajudicial technical experts in the field of electrical installations can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National

Authorization of project inspectors specialized in electrical installations.*

The authorization of individuals for carrying out, on the territory of Romania, in compliance with the legal acts and regulations in force applicable in the field of electrical energy, activities of project verification for electrical installations or electrical parts within complex projects, both those connected/belonging to the SEN, as well as those connected/belonging to isolated power systems.

Information regarding the authorization procedure for electricians, project verifiers, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be accessed via the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Companii
National

Modification of a certificate held by economic operators who design, execute, and inspect electrical installations.*

Modification of a certificate held by economic operators who carry out activities of design, execution, and verification of electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure for economic operators in the field of electricity can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Cetateni
National

Visa of the certificate of technical expert in quality and extrajudicial in the field of electrical installations.*

Visa for the certificate of technical quality and extrajudicial expert, for the purpose of carrying out, on the territory of Romania, with respect for the normative acts and regulations in force applicable in the field of electric energy, technical quality expertise activities for electrical installation works and/or when a legal act or a state control authority in the field of electrical installation works provides for this.

Information regarding the authorization procedure of electricians, project verifiers, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be consulted by accessing the following link:https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National

The authorization of quality technical experts and extrajudicial experts in the field of electrical installations.*

The authorization of technical quality experts and extrajudicial experts for carrying out, on the territory of Romania, with compliance to the regulatory acts and applicable norms in force in the field of electric energy, technical quality expertise activities for electrical installation works and/or whenever a legal act or a state body with control responsibilities in the field of electrical installation works provides for this.

Information regarding the authorization procedure for electricians, project verifiers, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National

Authorization of electricians in the field of electrical installations.*

The authorization of natural persons for carrying out, on the territory of Romania, in compliance with the applicable legislative acts and norms in the field of electric energy, the activities of designing and execution of electrical installations.

Information regarding the authorization procedure for electricians, project verifiers, as well as quality and extrajudicial technical experts in the field of electrical installations can be found on the ANRE website and may be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National

Authorization of the Sole Trader (PFA) for connecting appliances consuming gaseous fuels*

The conditions, deadlines, and procedures for granting the RPFA-type authorization, intended for connecting appliances consuming gaseous fuels.

*
PROCEDURA
Cetateni
National
Cross-border

Extension of the validity period of the authorized installer license in the field of natural gas*

The conditions, deadlines, and procedures for extending the validity period of the authorized installer card in the field of natural gas

*
PROCEDURA
Cetateni
National

Extension of the validity of the RPFA-type authorization*

The conditions, terms, and procedures for extending the validity of the authorization intended for connecting appliances consuming gaseous fuels, type RPFA.

*
PROCEDURA
Cetateni
National
Cross-border

Granting the status of technical expert to individuals who carry out technical expertise activities of technical projects in the natural gas sector*

The conditions, terms and procedures for granting the status of technical expert to individuals who carry out technical expertise activities of technical projects and/or upstream supply pipelines related to production, surface technological installations related to storage, objectives/systems related to the transport and/or distribution of natural gas, installations related to the activity of producing/storing biogas/biomethane, as well as LNG installations

The cumulative conditions of studies and practical experience in the natural gas sector required to participate in the certification exam as a technical expert are

  • graduation from an accredited higher education institution, in the following profiles/specialties from the field of engineering sciences: oil-gas, construction installations, other profiles/specialties related to technical activities in the natural gas sector
  • seniority as an ANRE authorized installer, authorization type PGD and EGD or PGT and EGT, depending on the type of certification requested, of at least 9 years;
  • seniority in the natural gas sector in design and execution/operation activities, depending on the type of certification requested, of at least 11 years
*
PROCEDURA
Companii
National

Withdrawal of authorizations granted to legal entities carrying out activities of installation and/or operation of cost allocation systems for heating and domestic hot water in condominium-type buildings*

This procedure refers to the applicable situations and the related process for the withdrawal of authorizations granted to legal entities that carry out installation and/or operation activities of cost allocation systems for heating and domestic hot water in condominium-type buildings. Applicable situations: the substantiated request, submitted by the authorization holder and accepted by ANRE;

*
PROCEDURA
Companii
National

Extension of the validity period of the authorization granted to legal entities that carry out installation and/or operation activities of the cost allocation systems for heating and domestic hot water in condominium-type buildings*

This procedure refers to the items related to the extension of the validity period of the authorization for legal entities carrying out installation and/or operation activities of cost allocation systems for heating and domestic hot water in condominium-type buildings.

*
PROCEDURA
Companii
National

Certification of economic operators established as a result of reorganization through merger, division, etc. of economic operators holding certificates issued by ANRE*

Certification of economic operators established as a result of reorganization by merger, division, etc. of economic operators holders of certificates issued by ANRE.

Information regarding the certification procedure of economic operators in the field of electric energy can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Companii
National

Suspension of a certificate held by economic operators who design, execute, and inspect electrical installations.*

Suspension upon request of a certificate held by economic operators who carry out activities of designing, executing, and verifying electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure of economic operators in the field of electricity can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Cetateni
National

Issuance of a duplicate license/certificate for authorized electrician, project verifier, as well as technical quality and extrajudicial expert in the field of electrical installations.*

Issuing a duplicate license/certificate for authorized electrician, project verifier, as well as for technical quality expert and extrajudicial expert in the field of electrical installations.

Information regarding the authorization procedure for electricians, project verifiers, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Companii
National

Issuance of duplicate certificate for economic operators who design, execute and inspect electrical installations*

Issuing a duplicate certificate for economic operators who carry out activities of design, execution, and verification of electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure for economic operators in the field of electric energy can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare.

*
PROCEDURA
Companii
National

Withdrawal upon request of a certificate held by economic operators who design, execute, and verify electrical installations.*

Withdrawal upon request of a certificate held by economic operators carrying out activities of design, execution and verification of electrical installations connected to the National Power System or belonging to Isolated Power Systems.

Information regarding the certification procedure of economic operators in the field of electricity can be found on the ANRE website and can be consulted by accessing the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-atestare

*
PROCEDURA
Cetateni
National

Visa for certificate of project verifier in the field of electrical installations.*

Endorsement of the project inspector's certificate, for carrying out, on the territory of Romania, in compliance with the regulations and standards in force applicable in the field of electricity, activities of verification of electrical installation projects or of electrical parts within complex projects, both those connected/belonging to the SEN, as well as those connected/belonging to isolated power systems.

Information regarding the procedure for authorizing electricians, project inspectors, as well as technical quality and extrajudicial experts in the field of electrical installations can be found on the ANRE website and can be accessed at the following link: https://www.anre.ro/ro/energie-electrica/informatii-de-interes-public/info-electricieni

*
PROCEDURA
Cetateni
National
Cross-border

Suspension/withdrawal of the status of authorized installer*

The finding of contraventions and the application of sanctions are carried out by ascertainment agents empowered for this purpose by the president of ANRE, according to the provisions of Law no. 123/2012, with subsequent amendments and additions.

The ascertainment agents of ANRE, depending on the seriousness of the established act, may propose the following complementary sanctions: a) suspension of the status of authorized installer, for a period of up to 6 months; b) withdrawal of the status of authorized installer, with the right to re-apply for a new examination after a period of 3 years; c) withdrawal of the status of authorized installer, without the right to re-apply for a new examination.

*
PROCEDURA
Companii
National

Authorization after the filing of the documentation and removal from the ANRE records of the application regarding the obtaining of authorizations for the activities of design, execution, and operation of objectives/systems/installations in the field of natural gas*

The conditions, deadlines and procedures for granting authorizations after the classification of the documentation and removal from the ANRE records of the application regarding obtaining for the activities of design, execution and operation of the objectives/systems/installations in the field of natural gas, within 30 days after the classification of the documentation and removal from the ANRE records.

*
PROCEDURA
Companii
National

Authorization of economic operators for the activities of design, execution, and operation of objectives/systems/installations in the field of natural gas*

The conditions, terms, and procedures for granting authorizations for the activities of design, execution, and operation of objectives/systems/installations in the field of natural gas.

*
PROCEDURA
Cetateni
National
Cross-border

Authorization of individuals who carry out activities in the natural gas sector*

The conditions, terms, and procedures for granting the status of authorized installer in the field of natural gas to individuals, for the activities of design, execution and operation of objectives/systems/installations in the field of natural gas, on the territory of Romania, in compliance with the applicable regulations and standards in force in the field of natural gas.

*
PROCEDURA
Companii
National

Modification of authorizations granted to legal entities carrying out activities of installation and/or operation of cost allocation systems for heating and domestic hot water in condominium-type buildings*

The procedure refers to the items related to the process regarding the modification of authorizations granted to legal entities that carry out installation and/or operation activities of cost allocation systems for heating and domestic hot water consumption in condominium-type buildings.

Applicable situations:

a) change of the legal entity's name;

b) modification of the legal entity's statute;

c) change of the legal entity's registered office address;

d) modifications regarding technical capacity or extension of the field of activity;

e) legislative modifications or changes in circumstances from the date of issuance of the authorizations or events that substantially affect or lead to the impossibility of carrying out the authorized activities.

*
PROCEDURA
Companii
Cross-border

The provision of cross-border services by economic operators, foreign legal entities, registered in an EU/EEA/Switzerland member country*

The provision of cross-border services for carrying out design, execution or operation activities of objectives/systems/installations in the field of natural gas in Romania, if they hold an equivalent document (corresponding to the types of authorizations mentioned in the Regulation) issued by a similar body from the country of origin.

*
PROCEDURA
Cetateni
National
Cross-border

Extension of the right to practice, for the purpose of continuing the activity as project verifier or technical expert*

The conditions, deadlines, and procedures for the extension of the right to practice, for the purpose of continuing the activity as a project verifier or technical expert, an archived file containing the documents provided in the Regulation, at least 30 days before the date of expiration of the validity of the permit.

The archived file mentioned above can also be sent in one of the following forms:

  • by e-mail to the address instalatori@anre.ro or to the address anre@anre.ro;
  • magnetic media sent to the ANRE registry;
*
National Regulatory Authority for Energy*
Str. Constantin Nacu, Nr. 3,sector 2, Sector 2, RO
Telefon: 021 327 81 74
Fax: 021 312 43 65
Email: anre@anre.ro

Assistance services

There are no Assistance services registered by this institution

Institutional structure

Directia Generala Surse Regenerabile, Cogenerare si Energie Termica
Direcţia Generală Licente, Tarife, Monitorizare Investitii

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro